Quick answer: Under Utah’s internal accessory dwelling unit law (Utah Code 10-9a-530, created by 2021 HB 82), a basement apartment inside an owner-occupied single-family home is a permitted use in primarily residential zones. Davis County cities can still require building permits, one extra parking space, owner occupancy and rentals of 30 days or longer, and may bar ADUs on lots of 6,000 sq ft or less.

Key takeaways

What does Utah law say about basement apartments?

Utah law treats a basement apartment in an owner-occupied home as an “internal accessory dwelling unit,” and cities must allow one as a permitted use in primarily residential zones. A permitted use means you do not need a discretionary approval like a conditional use permit just to have one.

The rules come from House Bill 82, “Single-family Housing Modifications,” signed March 16, 2021. The HB 82 bill page lists its sponsors and status, and the enrolled text of HB 82 contains the section that became Utah Code 10-9a-530.

Key definitions

A finished basement with its own kitchen, bathroom and sleeping area is the most common way Davis County homeowners create an internal ADU, because it stays within the existing footprint.

One important caveat: this summary is based on the 2021 enacted text. Later legislative sessions may have amended or renumbered the section, so verify the current statute and your city’s ordinance before you rely on any specific rule.

What can Davis County cities require for a basement apartment?

Cities cannot restrict one internal ADU based on its size relative to the house, total lot size or street frontage, except through the specific options the statute lists. Those options give each city real room to set conditions.

What a city MAY do under the 2021 law What it means for your basement
Require building, health and fire code compliance You still need a permit, egress, smoke and CO alarms and other code items.
Require one additional on-site parking space Plan where the extra car goes; if you convert a garage or carport, the city can require replacement parking.
Prohibit a separate utility meter The apartment usually shares the home’s gas and electric service.
Require the home to still look like a single-family dwelling Exterior changes, like a new entrance, may need to blend in.
Prohibit ADUs on lots of 6,000 sq ft or less Check your lot size on your plat or county records first.
Prohibit rentals of fewer than 30 consecutive days Nightly or weekly short-term rental is off the table.
Require owner occupancy The city can prohibit renting the ADU if the home is not your primary residence.
Require a rental permit or license Expect an application and possibly a fee.
Record a notice with the county recorder The ADU may show up in your property records.
Lien up to $100 per day for uncured violations After a 14-day cure period for short-term-rental violations or 30 days for others.

The statute also lets cities exclude internal ADUs from zones covering up to 25% of their residential area, prohibit them in mobile homes, and prohibit them where the home is served by a failing septic system. Ask your city whether your zone is one of the excluded areas.

How do Davis County cities handle internal ADUs in practice?

Each city writes its own ordinance within the state framework, so the details differ. West Bountiful and South Weber are two local examples with published rules or forms.

West Bountiful

The West Bountiful ADU page says attached and internal ADUs are allowed, while detached ADUs are not. The owner must live on site, one extra off-street parking space is required per ADU, only one ADU is allowed per lot, and a separate utility meter is not allowed. The ADU receives a “B” address, and an ADU agreement is recorded with the County Recorder.

South Weber

South Weber posts an ADU owner-occupancy affidavit on its city forms page, and building permits there go through the CivicReview portal.

Every other city

To plan a basement apartment Davis County cities will approve, call your planning or building department in Layton, Kaysville, Syracuse, Farmington, Bountiful, Clearfield or elsewhere and ask for the current ADU ordinance before you design. Our city-by-city Davis County permit guide lists each building department’s portal and contact details. If you live outside city limits, ask Davis County how it applies ADU rules to unincorporated parcels.

Can I rent my basement apartment as a short-term rental?

Usually not. The internal ADU definition is built around rentals of 30 consecutive days or longer, and cities may prohibit anything shorter.

There is a tax angle too. The Davis County Assessor’s primary residence page says short-term rentals such as Airbnb or VRBO do not qualify for the 45% primary residential exemption. That page does not address ADUs specifically, so ask the Assessor how your situation is treated.

For income planning with long-term tenants, see our post on ADU rental income.

What building code items matter most for a basement apartment?

A legal basement apartment still has to meet the code for habitable space and sleeping rooms. These are the items that most often shape the design.

Confirm all of these with your city’s building department. For layout inspiration, browse our ADU ideas.

Frequently asked questions

Is a basement apartment legal in Davis County?

Generally yes. Utah Code 10-9a-530, created by 2021 HB 82, makes an internal accessory dwelling unit a permitted use in areas zoned primarily residential, as long as it is inside an owner-occupied single-family home. Cities can still set conditions like parking, owner occupancy and minimum lot size, so check your city’s current ordinance before building.

Do I have to live in the house to rent out a basement apartment in Utah?

Often, yes. The 2021 law defines the primary dwelling as the owner’s primary residence and lets cities prohibit renting an internal ADU if the home is not the owner’s primary residence. West Bountiful requires the owner to live on site, and South Weber posts an owner-occupancy affidavit. Confirm your own city’s rule before you sign a lease.

Can a Davis County city require extra parking for a basement apartment?

Yes. Under the 2021 text of Utah Code 10-9a-530, a city may require one additional on-site parking space for an internal ADU. If you convert a garage or carport to create the unit, the city may also require replacement parking. West Bountiful, for example, requires one extra off-street space per ADU.

Can I put a separate utility meter on my basement apartment?

Possibly not. The 2021 law lets cities prohibit a separate utility meter for an internal ADU, and West Bountiful’s ADU page says no separate meter is allowed. In those cities, the apartment shares the home’s gas and electric service, and you settle utilities with your tenant through the lease. Ask your city before planning separate service.

What is the minimum rental term for an internal ADU in Utah?

The 2021 law defines an internal ADU as created to offer long-term rental of 30 consecutive days or longer, and it allows cities to prohibit rentals shorter than 30 consecutive days. Nightly or weekly short-term rental of a basement apartment is therefore usually not allowed. Check your city’s rental licensing rules as well.

Talk to a Davis County basement contractor

Lift Construction is based in Syracuse and builds basement apartments and in-law suites across Davis County. We can help you check your city’s ADU rules, plan egress, parking and layout, and handle permits. Learn more about our ADU construction services and basement finishing, reach out online, or call 801-683-6803.

Written by the Lift Construction team, led by owner and general contractor David Carter. Code and program details were checked against the official sources linked above as of October 2026 — always confirm current requirements with your city before you build.