If you’re researching egress windows, this guide covers everything you need to know before getting started. One of the most common questions we hear from Davis County homeowners is whether they can add a bedroom to their basement remodel. In almost every case, the answer depends on one key feature: a properly installed egress window. Here’s what homeowners across Layton, Kaysville, Farmington, and the rest of Davis County should understand before planning a basement bedroom. Getting egress windows right is one of the most important parts of any basement bedroom project.

egress windows

What Is an Egress Window, and Why Does It Matter

An egress window is a window large enough for a person to climb through in an emergency, typically paired with a window well if the opening is below ground level. Building codes require egress windows in basement bedrooms so occupants have a safe way to escape, and so first responders have a way to get in, in the event of a fire or other emergency.

General Egress Window Requirements

While exact requirements should always be confirmed with your local building department, general guidelines for basement bedroom egress windows typically include the following.

Ceiling Height and Room Size Requirements

Beyond the window itself, basement bedrooms generally need to meet minimum ceiling height requirements throughout the majority of the room, along with minimum floor area standards for habitable rooms. Bulkheads for ductwork or plumbing need to be planned carefully so they don’t drop ceiling height below what code allows in key areas of the room.

Other Requirements for Legal Bedrooms

Permits and Inspections

Adding a legal bedroom requires a building permit in every Davis County city, along with inspections at various stages of construction, including framing, electrical, insulation, and final walkthrough. Skipping this process can create major problems later, since an unpermitted bedroom typically cannot be counted as such during a home appraisal or sale.

Why Working With a Licensed Contractor Matters

Egress window and bedroom code requirements can vary slightly between cities within Davis County, and codes are periodically updated. A licensed, experienced contractor stays current on these requirements and handles the permitting and inspection process so your new bedroom is fully legal, safe, and add real value to your home.

Window Wells and Ongoing Maintenance

If your basement bedroom requires a window well, it’s worth planning for long-term maintenance in addition to meeting the initial code requirements. Window wells should be graded and drained properly so water doesn’t pool against your foundation, and covers can help keep out leaves, debris, and pests while still allowing for emergency escape. During installation, we make sure every window well is sized correctly, drains properly, and includes any required ladder or steps so it remains both code-compliant and low-maintenance for years to come.

Final Thoughts on Egress Windows

Choosing the right team for egress windows makes all the difference in the final result. According to Remodeling Magazine’s national Cost vs. Value Report, basement projects remain among the highest-return home improvements homeowners can make. Lift Construction brings the local knowledge, licensed trades, and attention to detail every project deserves.

Planning a Basement Bedroom?

Lift Construction has helped homeowners throughout Davis County add legal, code-compliant bedrooms to their basement remodels. Call us at 801-683-6803 or visit our contact page to schedule a free consultation.

More egress window and door tips

Plan Excavation and Prepare the Foundation Opening

Excavation is the highest-risk part of a basement egress window installation guide. You are changing the soil beside the foundation and cutting an opening through a structural wall. Plan the work around the foundation system, not just the window size.

First, locate buried utility lines through the proper local service. Then mark the well footprint outside. Leave enough room for the required 36-inch projection, the well wall, drainage connection, and safe access for the crew. Protect nearby concrete, landscaping, irrigation lines, and exterior finishes before soil comes out.

Inside the basement, remove finishes only after the layout is confirmed. Open a small inspection area first if the wall is covered. Look for rebar, post-tension cables, conduit, and pipes. A concrete wall may look plain from the room side while carrying important reinforcement.

Support the work as required by the structural plan. The cut must have clean edges, and the new header or support must carry the load above the window. Never assume the window frame can replace a structural header. A qualified contractor should set the opening size and support detail before cutting.

The well also needs drainage. A gravel bed alone is not a substitute when water has nowhere to go. Test the drainage path before the well is backfilled.

We plan excavation with the final basement finish in mind. LIFT Construction can coordinate the opening with framing, insulation, electrical work, and trim, so the new window does not become an isolated repair. If the project includes a lower exit stair, review the basement egress stair design guidance before excavation begins.

Keep the soil pile away from the foundation edge. Heavy soil near an open cut can put extra pressure on the wall and make the work area unsafe. Use shoring or other protection when site conditions call for it.

At this milestone, the opening should be marked, the support plan should be set, and the drainage route should be known. If a contractor cannot explain those three items, the work is not ready to start.

Add Ladder or Steps and Verify Safe Emergency Exit

The last step in a basement egress window installation guide is a hands-on exit test. A deep well needs a permanent ladder or steps, and every part of the escape path must remain usable after the window opens.

If the well is more than 44 inches deep, install a permanently fixed ladder or steps. The ladder must have at least 12 inches of inside width. It must project at least 3 inches from the wall, and the rungs can be no more than 18 inches apart vertically.

Steps use different measurements. Their inside width must be at least 12 inches. Each tread needs at least 5 inches of depth, while each riser must be no more than 18 inches high. Measure the full height of the well, not just the section closest to the window.

The ladder or steps may encroach up to 6 inches into the required well dimensions. That allowance does not mean the well can be made smaller overall. Keep enough open space for a person to turn, climb, and reach the window without striking the sash.

Open the window from inside the room. Then climb into the well and move toward the yard. Check the following points:

Verify the 12-inch ladder width, 3-inch wall projection, and 18-inch maximum rung spacing during the final inspection.

Take photos of the open window, the well dimensions, the ladder, and the drainage path for your project file. Then schedule the required inspection before covering the work. We at LIFT Construction help homeowners review the finished exit so the opening remains safe after the basement receives walls, trim, and furnishings.

Pro Tip: Put a small reminder near the room’s furniture plan: never store bins, shelves, or patio items in front of the window well.

Choose the Location and Check Utilities, Structure, and Drainage

Choosing the wall is the next part of how to install a basement egress window in Utah. The best location must work inside the room and outside the foundation.

Walk the basement first. Mark the planned finished floor, nearby walls, stairs, ducts, pipes, electrical lines, and large fixtures. Leave enough room for a person to reach the window without moving furniture. A bedroom layout can make a code-compliant opening hard to use if a bed or built-in cabinet blocks it.

Then inspect the exterior. Look for hose bibs, gas lines, sprinkler lines, utility entries, downspouts, and buried service routes. Never assume the soil is clear because the inside wall looks empty. Have underground utilities located before digging.

The foundation also needs a structural review. A basement wall carries the weight of the home, and a new opening changes how that load moves around the window. The plan may need a properly sized header, a reinforced opening, or a window buck. A window buck is the framed structure that holds the window and transfers pressure around the cut opening.

We also check the planned well against the finished grade. A well that sits too low can collect snowmelt or storm water. One that sits too high may leave too little room for the required opening and ladder. Utah’s freeze-thaw cycles make water control especially important around a below-grade wall.

Keep your planning documents together, including this basement-finish document, and discuss the planned opening with your local building official.

Plan the drainage before you dig. Depending on the site, the well may need a drain tied into an approved drainage system, a gravel base, or another method accepted by the local official. Do not route water toward the foundation or rely on a loose layer of gravel alone.

Take photos of the wall before demolition. Mark measurements on the plan. This record helps the crew spot conflicts before the saw reaches the concrete.

Pro Tip: Draw the window, well, finished floor, and exterior grade on one elevation sketch. A single drawing often reveals a sill-height or drainage problem early.

Walkout Basement Doors, The Strongest Option for Sloped Utah Lots

Walkout basement doors connect the lower level to grade through a sloped yard. They’re best for Utah homes built into a hillside, especially where one side of the basement already sits close to outdoor grade.

A walkout can solve the egress question while adding a useful daily entrance. It may support a basement apartment, guest room, family room, or storage area that needs regular access. But the design must still address the bedroom’s clear opening, the landing, and the path to a safe exterior area.

Site slope drives the cost and layout. A gently sloped lot may need only a short stair run. A steep lot may need retaining walls, drainage work, or a longer stair path. The excavation must leave enough room for workers to waterproof the wall and for water to flow away from the door.

Here’s a quick way to compare the main choices:

We treat a walkout as a site and structure project, not a door swap. The plan should show the grade line, stair path, drainage point, and foundation support before excavation begins.

One more issue is privacy. A walkout can bring foot traffic close to a bedroom. Window placement, fencing, lighting, and the door’s view from inside should be part of the room plan.